by George Booth | May 8, 2024 | Case Studies
Project Description: New-build Sheltered Accomodation and Training Centre Rascasse, Silver End, Braintree, Essex 9 (no.) self-contained sheltered accommodation units and training centre for a local Care Home provider. Contractor: M & P Dunn Client: Zero Three Care...
by George Booth | Apr 26, 2024 | Case Studies
Project Description: New-build Single Detached in Walthamstow, East London A high-spec timber frame, warm roof construction with brick outer leaf with a low design air permeability due to the use of a combined heating, hot water and ventilation system, NIBE F730...
by George Booth | Apr 25, 2024 | Air Permeability Testing, Case Studies
Project Description: New-build dwelling end-of-terrace in Billericay Essex A single dwelling of traditional brick and block construction with 100mm cavity, partially filled with 90mm Kingspan K106 phenolic insulation boards. Contractor: Connection Construction...